Açı High School

Client
Açı
Year
2006
Program
School
Status
2007
Scale
İstanbul

The project involved redesigning an existing building as a school and redeveloping the other three adjoining buildings as laboratories, classrooms and a conference hall in 2006.
The structure involves precast beam, column and floor slabs to speed up the building process.
Even though the building stands out with its texture, proportionally it is in harmony with the woodland in which it is located.

Design Team:
Armağan Ekiz, Tolga Yağlı

Statical Project:
Levent Özden
Mechanical Project:
Teknoel
Electrical Project:
Teknoel
General Contractor:
4U İnşaat

Photography:
Cemal Emden


deneme bonusu veren siteler
deneme bonusu veren siteler