Açı High School

client

Açı

year

2006

program

Education

end year

2007

Design Team:

Armağan Ekiz, Tolga Yağlı

The project involved redesigning an existing building as a school and redeveloping the other three adjoining buildings as laboratories, classrooms and a conference hall in 2006.
The structure involves precast beam, column and floor slabs to speed up the building process.
Even though the building stands out with its texture, proportionally it is in harmony with the woodland in which it is located.

Statical Project:

Levent Özden

Main Contractor:

4U İnşaat

Mechanical Project:

Teknoel

Electrical Project:

Teknoel

Photography:

Cemal Emden

project location